North Dakota Street Stormwater Improvements | SW North Dakota Street Tigard, OR 97223 | |
North Dakota Street (Fanno Creek) Bridge Replacement | 10250 SW North Dakota St. Tigard, OR 97223 | |
Generator Replacement at Pump Station 1 | 10310 SW Canterbury LN Tigard, OR 97224 | |
Locust Street Safe Routes to School - CIP Project | 10350 Lincoln St (Locust between 92nd & Lincoln) Tigard, OR 97223 | |
Bagan Park Development | 10910 SW Greenburg Road Tigard, OR 97223 | |
121st Ave Sidewalks and Bike Lanes | 121st Ave (Whistlers Lane to Tippitt Pl) Tigard, OR 97223 | |
121st Avenue Bridge and Summer Creek Bank Stabilization (94057) | 13125 SW Hall Blvd Tigard, OR 97223 | |
SW 95th Avenue/Highway 217 Pedestrian and Bicycle Bridge Refinement Study (95084) | 13125 SW Hall Blvd Tigard, OR 97223 | |
Reservoir 8-1 Structural Improvements (96064) | 13125 SW Hall Blvd Tigard, OR 97223 | |
ASR Expansion Feasibility Study (96070) | 13125 SW Hall Blvd Tigard, OR 97223 | |
Risk and Resilience Assessment and Emergency Response Plan (96078) | 13125 SW Hall Blvd Tigard, OR 97223 | |
Library HVAC | 13500 SW Hall Blvd. Tigard, OR 97223 | |
Reservoir 18 and Pump Station Design @ Sunrise | 150th Avenue and Sunrise Lane Tigard, OR 97223 | |
Lasich Park Property Plan | 16147 SW Roy Rogers Road Tigard, OR 97224 | |
Cook Family Park - Accessible Dock Replacement | 17005 SW 92nd Ave Tigard, OR 97224 | |
Roy Rogers Road | 17018 SW Rocky Ramble Ln Sherwood, OR 97140 | |
Universal Plaza - Phase II | 9100 Burnham Street Tigard, OR 97223 | |
Ash Avenue and Ash Drive Stormwater System and Pavement Repair | Ave Avenue and Ash Drive Tigard, OR 97223 | |
Cured-In-Place Pipe | Citywide Tigard, OR 97223 | |
Traffic and Transportation System Major Maintenance Program | Citywide Tigard, OR 97223 | |